12:30-1:45TTH Rhodes 312
Schedule
(Tentative)
Date | L# | Topic |
Thu. Aug.22 | 01 | Introduction; course overview |
Tue. Aug.27 | 02 | Image compositing, historical overview, basic technique, The Gimp |
Thu. Aug.29 | 03 | Image representation (channels and layers), RGB color space |
Tue. Sep.03 | 04 | Class cancelled Self-study Assignments:
|
Thu. Sep.05 | 05 | Class cancelled Self-study Assignments:
|
Tue. Sep.10 | 06 | Guest lecturer: Tim Davis File formats (headers, data), compression schemes (lossy, lossless, etc.) |
Thu. Sep.12 | 07 | Guest lecturer: Tim Davis Image I/O, memory storage |
Tue. Sep.17 | 08 | Image mapping |
Thu. Sep.19 | 09 | Image warping (introduction) |
Tue. Sep.24 | 10 | Apple Shake: GUI, interaction Module 01: UI Project 1 due (The Gimp) |
Thu. Sep.26 | 11 | Apple Shake: GUI, interaction Module 02: UI, Voyager, Fairy composites |
Tue. Oct.01 | 12 | Apple Shake: basic compositing Module 03: split screen comp Module 04: blob comp |
Thu. Oct.03 | 13 | Apple Shake: chroma-keying Module 07: rotoshape, ship comp Module 09: primatte, ashtray comp Module 10: keylight, viper comp |
Tue. Oct.08 | 14 | Apple Shake: color correction Module 05: beach images |
Thu. Oct.10 | 15 | Apple Shake: basic image stabilization Module 08: sentinel comp |
Tue. Oct.15 | 16 | Apple Shake: match-moving, tracking Module 13: building, watch comps |
Thu. Oct.17 | 17 | Apple Shake: anamorphic images and depth-mapping Module 11: vine comp |
Tue. Oct.22 | 18 | Apple Shake: painting and dirt removal Module 06: quickpaint and crow comp |
Thu. Oct.24 | 19 | Apple Shake: animation and command line Module 12: fairy comp Module 14: command line |
Tue. Oct.29 | 20 | Image warping (cont'd) |
Thu. Oct.31 | 21 | Class cancelled Self-study Assignments:
|
Tue. Nov.05 | -- | Fall Break |
Thu. Nov.07 | 22 | Sampling theorem & Fourier transform Project 2 due (Apple Shake: several short labs) |
Tue. Nov.12 | 23 | Convolution (OpenGL )and image filtering |
Thu. Nov.14 | 24 | Screenplays & scripts |
Tue. Nov.19 | 25 | Storyboards |
Thu. Nov.21 | 26 | 3-act story structure |
Tue. Nov.26 | 27 | Poject 3 demos Project 3 (Image Manip Tool: rotate/scale) due Final project script &: storyboards due |
Thu. Nov.28 | -- | Thanksgiving |
Tue. Dec.03 | 28 | Inverse DWT & pyramidal image representation |
Thu. Dec.05 | 29 | Final project planning: scripts, storyboards, CG/live action
elements & compositing |
Fri. Dec.13 | 30 | Final animation due Project presentations 1:00-4:00pm |